All Feasibility Studies
HMOOptions Tested

Existing HMO Reconfiguration

Manchester, Greater Manchester

An existing Manchester HMO tested for reconfiguration, checking whether the current layout was leaving room count or room quality on the table.

Existing HMO Reconfiguration
Building typeExisting HMO
Study outputSketch layout
FocusRoom quality
Building typeExisting HMO
Planning routeLicensing and building regulations led
01

The Challenge

Beech Mount already operated as an HMO, but the client suspected the layout was underperforming: awkward room shapes, weak communal provision, and circulation that ate lettable space. The question was whether a reconfiguration could improve the room schedule without triggering disproportionate building work.

02

Our Approach

We redrew the building from the existing plans and tested a revised layout, room by room, against current HMO space and amenity standards. The sketch balances additional en-suite provision against the cost of moving services and structure.

03

The Outcome

The client received a drawn reconfiguration option with a room schedule to compare against the building's current performance, giving a clear basis for the refurbishment decision.

The Drawings

Existing HMO Reconfiguration, drawing 1