King's Lynn, Norfolk

One building, two viable futures. We drew a residential conversion and a seventeen-room co-living HMO for the same envelope so the client could compare income, build scope and planning risk directly.

Routes compared2
HMO option17 en suite
Both optionsWith extension
Planning routeClass MA prior approval, then full planning
DateNovember 2025

Feasibility In Brief

01

The Brief

Greyfriars Chambers is a landmark corner building on St James Street: a former public house, extended in an Art Deco style, refurbished as offices in 2018 and occupied by an accountancy practice, with around 365 sqm over two floors and parking to the rear. The client held it under an option agreement and needed to know, before exercising it, whether the building should become conventional flats or a large co-living HMO. Each route carries a different planning risk, build cost and income, and committing to the wrong one early would have meant abortive design fees and a weaker planning story.

02

What We Found

We sketched the building both ways to the same standard. Option 1 tests a residential conversion into eight flats, with an extension. Option 2 tests a seventeen-bedroom en-suite HMO with the same extension, with the shared kitchen, living and laundry distributed across the plan rather than pushed into one corner, a plant room and a cleaner's store. Both layouts are colour-coded by room function with every bedroom size stated on the drawing, so the two schemes compare like for like. Room sizes on the HMO option run from 10.8 to 22 sqm, well clear of the licensing minimums.

03

Our Recommendation

Go, on a phased planning strategy. Establish the residential principle first through Class MA prior approval for the office-to-residential conversion, which is a low-risk application with a fixed timetable, then use that consent as the fallback while a full planning application is made for the larger co-living scheme. The co-living scheme is the higher-value outcome and the one the building suits best, but the client should never be in a position where the only consent in hand is the harder one.

The Proposed Layout

Click to enlarge
Option 1 of 2

Option 1 converts the offices into eight flats with the extension. Option 2 takes seventeen en-suite bedrooms with shared living, kitchen and laundry spread across both floors.

What The Client Received

Feasibility Overview

The proposed design, planning route, key constraints, commercial position and a clear Go or No-Go recommendation.

Planning Research & Risk Analysis

Site-specific policy research, planning precedents, appeal decisions and a risk register with cost implications.

Space & Standards Review

Bedroom, amenity, ceiling-height, kitchen and facility requirements checked room by room against the design.

These are real client reports, so they are not published here.

The Decision

A clear route forward before purchase.

A phased route that unlocks the bigger scheme. The feasibility turned an abstract use-class question into a direct comparison of two drawn schemes, and recommended securing the simpler consent first so the larger one could be pursued from a position of strength. The client exercised the option. Class MA prior approval has since been granted and the co-living scheme is in full planning, so the project also appears under Projects.

Recommended roadmap

  1. 01Measured survey
  2. 02Class MA prior approval
  3. 03Pre-application on the co-living scheme
  4. 04Full planning application
  5. 05Technical design
  6. 06Construction